Deprecated: preg_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /home3/richagrs/public_html/wp-content/themes/construction-light/inc/dynamic.php on line 11

Deprecated: preg_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /home3/richagrs/public_html/wp-content/themes/construction-light/inc/dynamic.php on line 11

Deprecated: preg_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /home3/richagrs/public_html/wp-content/themes/construction-light/inc/dynamic.php on line 11

Deprecated: preg_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /home3/richagrs/public_html/wp-content/themes/construction-light/inc/dynamic.php on line 11

Municipal

Benton Utilities: 2018 Waterline Improvement Project

The Benton Utilities’ 2018 Waterline Improvements included three schedules of work totaling $540,150.00 in construction costs.  The project included 8,140 linear feet of waterline replacement within the City of Benton.  Also included were 13 fire hydrants, 158 service re-connections, street bores, waterline taps, and other appurtenances.   This project was critical in replacing areas of Benton Utilities’ older infrastructure in need of upgrades.

Benton Utilities: Lilian Street and Sterling Oaks Waterline Extensions

The Benton Utilities Lilian Street and Sterling Oaks Waterline Extensions included 1380 linear feet of 8” C-900 Waterline and 1490 linear feet of 10” C-900 Waterline replacement, respectively.  The Lilian street project was an upgrade to the existing utilities within Benton Utilities’ existing water distribution system.  The Sterling Oaks Waterline was installed to connect two areas of an existing water system to improve flows.

City of Haskell: 2015 Pump Station Improvements

In 2015, City of Haskell, AR obtained our services for improvements to two pump stations within their Wastewater collection system.  Included in the improvements were new pumps/pump retrofitting and new discharge piping installation.  We performed the design calculations needed for the pump station upgrades, coordinated with pump representatives, and worked with the installation contractor to ensure the project was built to the correct specifications.  The pump station improvements proved to be effective in reducing operation and maintenance costs for the City.

City of Haskell: 2018 Park Project

Our staff worked to support the City of Haskell Mayor in obtaining their 2018 Arkansas State Park Matching Grant.  Following award of their grant, we designed and provided construction drawings for a new basketball facility.  We coordinated with State grant staff as well as the City and construction Contractor to ensure the project was built as per the design specifications.

WWTP Study/Corrective Action Plans

We have worked with the City of Haskell as well as other entities to provide assistance in investigating wastewater treatment plant operations and providing solutions to help mitigate permit violations.  We were proud to see that following implementation of recommended improvements many facilities have come back into compliance with their permitted discharge limits.  We’re glad to offer the service to provide corrective action plans for authoritative agencies on our clients’ behalf and offering solutions to help them back within permitted water quality limits.

Riverside Pump station/Force main and Creek Crossing

We’re very proud to provide our services to Riverside Grocery and Riverside RV on their endeavor with the much-needed connection to City utilities.  Riverside Grocery near the Benton City Limits is in an environmentally sensitive area between Taylor Creek and the North Fork of the Saline River.  Our staff designed the pump station, force-main, highway and creek crossings for this project.  We also coordinated with the City, obtained the ADEQ and Corps of Engineers permits needed for construction.  We’re glad to add this successful project to our portfolio.

Highway 10 Commercial Sewer Extension

Together with Little Rock Water Reclamation Authority and the Arkansas Department of Transportation we worked to extend sewer to a commercial property located along Highway 10, Little Rock, Arkansas.  We produced construction drawings, coordinated with LRWRA and ARDOT, assisted the Contractor while working among a multitude of existing utilities, and are pleased to have helped our client with a much-needed connection to municipal sewer.

Residential & Commercial Development

Woods at Hurricane Lake Estates: Saline County, AR

Eagle Ridge: Saline County, AR

The Stables: Saline County, AR

The Stables is a premier 40 Lot residential subdivision, located just outside the City Limits of Bryant, Arkansas.  Included in this project was 4,750 linear feet of 8” waterline, hydrants and other appurtenances.  Also constructed under this contract were approximately 10,000 cubic yards of dirt work, 10,000 tons of gravel base rock, and nearly 2,000 tons of asphalt paving.  We’re very pleased to have been involved with this development from conceptual stages through completion of construction.

Winds of Osage Subdivision: Saline County, AR

We were honored to design and oversee the construction for another premier subdivision in Saline County.  Winds of Osage consisted of 40 large acreage tracts over two phases of development.  Construction included 4,200 linear feet of waterline, hydrants and other appurtenances.  Also constructed under this contract were approximately 15,000 cubic yards of dirt work, various culvert installations, 4700 tons of gravel base rock, and nearly 1,400 tons of asphalt paving. 

Crossroads Subdivision: Saline County, AR

Our firm has designed and overseen construction for two phases of development in Crossroads Village Subdivision, located in Saline County, Arkansas and are currently overseeing construction on a third phase.  We are very pleased with the response this development is received from the community.  Currently, there are approximately 80 homes in this subdivision, with nearly 200 more preliminary platted.  Our team has provided surveying, engineering, and construction management and administration services for this project.

To date we’ve designed and overseen construction for approximately 5,827 linear feet of street construction with large diameter drainage infrastructure, 2,937 linear feet of Waterline installation, ranging from 2” to 6” waterline, and over 4,000 linear feet of 8” gravity sewer ranging from 5’ to 15’ in depth.

Hayden Creek: Bryant, AR

Located in the heart of downtown Bryant, Hayden Creek is a quiet subdivision located on a cul-de-sac.  This subdivision is ideal for quiet family living within walking distance of downtown Bryant and Bryant High School.  This subdivision contains 20 lots approximately ¼ acre in size.  We’re proud to work with the Developer and share in his vision for this beautiful neighborhood.

Circle K Convenient Stores

We’re proud to call Circle K Convenient Stores one of our newest clients.  We currently have two stores under construction.  The first located in Benton, Arkansas and the second located in Little Rock, Arkansas.  From conception to City planning and permitting, design, and construction, we offer a full scope of engineering services to our clients.   The Civil design plans included Site Plan, Grading Plan, Utility Plans as well as Erosion Control and Storm water Prevention and Pollution Plans.  Both the Benton and Little Rock stores are expected to open in 2019.